RRB NTPC Preparation Series: Part 4 - Time & Work + Pipes & Cisterns in Maths
RRB NTPC Preparation Series: Part 4 - Time & Work + Pipes & Cisterns in Maths
Friends! Ee RRB NTPC 2025 preparation series lo Part 4 ki vacham, topic "Time & Work" + "Pipes & Cisterns" meeda. Idi Maths lo super high weightage combo –
- CBT 1 lo 2-4 questions (7-13% weightage),
- CBT 2 lo 3-5 questions (9-14% weightage),
- Total Maths lo ~25% questions (with Percentage, Profit, Interest combine).
2025 Update (Oct 28): RRB UG notification live – total vacancies 11,910. Time & Work lo LCM method, negative work, efficiency comparison ekkuva vastunnayi. Pipes & Cisterns lo leakage + inlet/outlet combo, time to empty full tank trending. Exam Jan-Feb 2026.
- Formulas (15+)
- Shortcuts (8+)
- Examples (6 NTPC level)
- Practice (12 graded)
- Integration with Part 1-3
- 2025-specific strategy
Next Part 5: Time & Distance? Adigite cheptha. Let’s conquer Maths 32+ marks! 💪
Step 1: Introduction & NTPC Relevance
Friends, Time & Work ante "1 person 1 day lo entha work chesthadu?" – efficiency base. Pipes & Cisterns ante Time & Work ka variation – inlet fills, outlet empties.
| Topic | CBT 1 Qs | CBT 2 Qs | % Weightage |
|---|---|---|---|
| Time & Work | 1-2 | 2-3 | 7-10% |
| Pipes & Cisterns | 1-2 | 1-2 | 5-8% |
| Combo | 2-4 | 3-5 | 12-14% |
Telugu: Ee topic Ratio, LCM, Percentage tho link undi. 2025 lo negative work, combined efficiency, time comparison common. English: Core concept = Work Rate. Master for 100% accuracy.
Step 2: Core Concepts (Building Blocks)
| Term | Telugu Meaning | English |
|---|---|---|
| Work (W) | Purna panii (1 unit) | Total job = 1 |
| Efficiency (E) | 1 day lo entha work | Work per day |
| Man-Days | Person × Days = Work | M×D = W |
| Inlet | Tank ni fill chestundi | Positive work |
| Outlet/Leak | Tank ni empty chestundi | Negative work |
Telugu: 1 person 10 days lo 1 work → efficiency = 1/10 per day. English: Work = Efficiency × Time.
Step 3: All Key Formulas (15+ with Telugu)
| # | Formula | Telugu | Example |
|---|---|---|---|
| 1 | Efficiency = 1 / Days | 1 person 5 days lo 1 work → E = 1/5 | A: 1/10 |
| 2 | Work = E × T | E × Time = Work | 1/10 × 10 = 1 |
| 3 | Combined Efficiency | A + B = 1/x + 1/y | A=1/6, B=1/8 → 7/24 |
| 4 | Time together | 1 / (A+B) | 24/7 days |
| 5 | LCM Method | Total work = LCM of days | 6 & 8 → LCM=24 units |
| 6 | A does x%, B does y% | A = x/100, B = y/100 | 60% = 3/5 |
| 7 | Negative Work | Outlet = -1/x | Leak = -1/12 |
| 8 | Net Rate (Pipes) | Inlet - Outlet | +1/6 - 1/12 = 1/12 |
| 9 | Time to fill | 1 / Net Rate | 12 hours |
| 10 | Work left after t hrs | 1 - (Rate × t) | 1 - (1/12 × 6) = 0.5 |
| 11 | A alone after B leaves | B works t1, A works t2 | Standard |
| 12 | Alternate days | A + B + A + ... | Pattern |
| 13 | Wages | Work × Rate | A does 60% → 60% wage |
| 14 | Efficiency ratio | A:B = 3:2 → Time = 2:3 | Inverse |
| 15 | Pipes fill in parts | 2/3 fill in t hrs | t = (2/3) / Rate |
English: LCM method = fastest. Negative rate for outlet.
Step 4: Shortcuts & Hacks (NTPC Speed Boosters)
| # | Shortcut | Use |
|---|---|---|
| 1 | LCM = Total Work | 10 & 15 days → LCM=30 units |
| 2 | Efficiency = Units/Day | A=3, B=2 units/day |
| 3 | Time = Work / Efficiency | 30 / 5 = 6 days |
| 4 | A:B efficiency = inverse days | 5:10 days → 2:1 efficiency |
| 5 | Net rate = LCM / (LCM/A + LCM/B) | Direct |
| 6 | Leak time = -ve rate | -1/20 → 20 hrs to empty |
| 7 | Fill 1/2 tank | Time = 0.5 / Rate |
| 8 | A does 3/5 work | Time = (3/5) × Alone time |
Telugu: LCM trick 5 secs lo solve chestundi. English: Avoid fractions – use LCM units.
Step 5: Step-by-Step Examples (6 NTPC Level)
Example 1 (Basic - CBT 1) Q: A does a work in 10 days, B in 15 days. Together in how many days? Step 1: LCM(10,15)=30 Step 2: A=3, B=2 units/day Step 3: A+B=5 → Time = 30/5 = 6 days Telugu: LCM method best!
Example 2 (Pipes - CBT 2) Q: Inlet fills in 12 hrs, outlet empties in 18 hrs. Together time to fill? Step 1: LCM(12,18)=36 Step 2: Inlet=+3, Outlet=-2 Step 3: Net=+1 → Time = 36/1 = 36 hrs English: Negative for outlet.
Example 3 (Leak + Inlet - 2025 Trend) Q: Pipe fills in 8 hrs, leak empties in 12 hrs. With both, time to fill? Step 1: LCM=24 Step 2: Pipe=+3, Leak=-2 Step 3: Net=+1 → 24 hrs Telugu: Leak = outlet.
Example 4 (A leaves early) Q: A & B together 12 days. A works 6 days, B alone finishes in 18 days. A alone? Step 1: A+B = 1/12 Step 2: A×6 + B×18 = 1 Step 3: B = 1/30 (from 18 days alone) Step 4: A×6 + 18/30 = 1 → A×6 = 0.4 → A = 1/15 → 15 days
Example 5 (Wages - Ratio) Q: A:B efficiency 3:2, total wage Rs. 5000. A’s share? Step 1: Ratio 3:2 → A=3 parts Step 2: A = (3/5)×5000 = 3000
Example 6 (Alternate + Part work - Hard 2025) Q: A=10 days, B=15 days. A works 1st, 3rd day; B 2nd, 4th. In 5 days, work done? Step 1: LCM=30 Step 2: A=3, B=2 Step 3: Day1: A=3, Day2: B=2, Day3: A=3, Day4: B=2, Day5: A=3 Step 4: Total = 3+2+3+2+3 = 13 → 13/30
Step 6: Practice Questions (12 Graded)
Easy
- A does in 20 days. Efficiency per day?
- A & B together 12 days. A alone 20 days. B alone?
Medium 3. Pipe fills in 10 hrs, leak in 15 hrs. Together time? 4. A:B = 3:4 efficiency. Time ratio? 5. A does 2/3 work in 12 days. Full work?
Hard 6. A=12, B=18, C=24 days. A & B start, C joins after 4 days. Total time? 7. Inlet 8 hrs, outlet 12 hrs. Tank fills in 48 hrs. Capacity? 8. A works 5 days, B 3 days alternate. A starts. 60% work in how many days? 9. Pipe fills 3/4 in 9 hrs. Leak empties 1/2 in 6 hrs. Together time for full? 10. A & B fill in 6 hrs. B & C in 8 hrs. A & C in 12 hrs. All 3 time? 11. A does 40% in 8 days. B does rest in 15 days. Together? 12. Leak empties full tank in 10 hrs. Inlet fills in 8 hrs. With both, 1/3 fills in how much time?
Step 7: Answers + Explanations
- 1/20
- 30 days (1/12 - 1/20 = 1/30)
- 30 hrs (LCM=60, +6-4=+2 → 30)
- 4:3 (inverse)
- 18 days (2/3 work in 12 → 1 in 18)
- 8 days (LCM=24, A+B=5, 4 days=20, left=4 → C=1 → 4 days)
- 96 liters (Net rate=1/48 tank/hr → capacity=96)
- 6 days (A=1/10, B=1/15, LCM=30, A=3,B=2; 5 days=3+2+3+2+3=13, 60%=18/30 → scale)
- 36 hrs (complex, step-by-step)
- 4.8 hrs (1/a+1/b+1/c = solve)
- 10.8 days
- 4 hrs (net rate calc)
Step 8: 2025 Strategy + Common Mistakes
Strategy:
- Daily: 40 questions (RS Aggarwal Ch. 15-16).
- LCM Table: 6,8,10,12,15,18,20,24,30 memorize.
- Mock: Adda247 2025 series – Pipes section.
- Link: Efficiency = % (Part 1), Wages = Profit share (Part 2).
Avoid:
- Direct add days (wrong).
- Forget negative rate.
- LCM skip cheyadam.
Telugu: 1 week lo master, weekly 1 mock. English: Target: 0 wrong – combo topic.